
300L 2 tank 3 vessel brewhouse
- Inner stretching membrane and PE paper and outer steel
- frame, and other packaging for shipping.
1. Main tanks, vessels and machines will be packaged with - plastic paper firstly then with painted steel frames.
2. All spare parts, accessories and fittings will be packaged - with wooden box.
3. All items wrapped with soft package for protection.
Professional 300l beer brewery equipment 3bbl fermenting equipment
The 2 tank 3 vessel brewhouse improve filtration speed and production efficiency, and maintained good transparency of the wort. And we can heat water in the kettle tank, which can saves the cost of one hot water tank.
Mashing System
Without a hot water tank. (Can save the cost of hot water tank, hot water pump and related pipelines)
We can heat the water in the kettle tank, then transfer the hot water to the mash/lauter tun directly.
While mashing, we can continue to heat water for grain washing, or for next batches brewing.
Of course, if you prefer the hot water tank, we can customize it for you.
Filter method:Liquid pressure difference

-Detailed Pictured
![]() |
![]() |
![]() |
Cleaning Ball |
Heating Exchanger |
Wort Pump |
![]() |
![]() |
![]() |
Hop Filler |
Oxygen Filling Device |
Whirlpool |
![]() |
![]() |
![]() |
Raker |
Grain out door |
Sight Glass |
![]() |
![]() |
![]() |
Sparging Spare Ring |
Balance Tank |
Yearst Adding Tank |
![]() |
![]() |
Fermenting system e
standard, supply Miller, arch, corrugated plate and so on.
Design pressure is 0.3MPa; Working pressure is 0.15MPa.
Material: Stainless steel 304.
Malt milling system
Crushing ability: 200kg/h
Rollers distance can be adjustment very easily.

![]() |
![]() |
![]() |
Cooling Tank |
Cooling Water Pump |
Cooling Unit |
Another area of concern – Heating method
Electric tube heating method or steam heating method (Recommend), and direct fire heating method.
Electric heating with electric tube as prerequisite
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Yes, HULK designers will assist in initial space planning by providing AutoCAD(2D) and Solidworks (3D) layouts of our brewing equipment that can be coordinated into your floor plan development.
We can feedback with draft drawing within 2 working days.
Hulk equipment is a professional manufacture with more than 10 years experience.
Hulk equipment is a professional manufacture with more than 10 years experience.